Product Details:
|
Product Name: | 4 Clamps Fusion Welding Machine For HDPE Pipe 90mm 110mm 125mm 140mm 160mm 180mm 200mm 250mm | Pipe Size: | 63.75.90.110.125.140.160.180.200.225.250 |
---|---|---|---|
Heating Plate Max. Temp: | 270℃ | Total Power: | 3.3KW |
Weight: | 110kg | Dimension: | 900*670*540mm |
High Light: | MPP Butt Fusion Welding Machine,PVDF Butt Fusion Welding Machine,3.3kW HDPE Butt Fusion Welding Machine |
4 Clamps Fusion Welding Machine For HDPE Pipe 90mm 110mm 125mm 140mm 160mm 180mm 200mm 250mm
63mm-250mm 4 Clamps HDPE PIPE manual Butt Fusion Welding Machine
1. The raw material of the machine frame is aluminum, it is light but strong, is one of the best material for machine.
2. The main electrical apparatus elements are best of china, many are imported from abroad.
3. Removable PTFE coated heater with separate temperature control system, the temperature can be controlled to a minimum range.
4. The electric facer adopts reversible double cutting edge blades, which can make the cutting effect more perfect.
Butt Fushion Welding Machine Technical data:
Model | SHY250-4M | SHD250-4M |
Working Range | 63-250mm | 63-250mm |
Caliber (mm) | 63, 75, 90, 110, 125, 140, 160, 180, 200, 225, 250 | 63, 75, 90, 110, 125, 140, 160, 180, 200, 225, 250 |
Heating board max temp. | 270 °C | 270 °C |
Temperature bias | '+/-5° | “+/-5° |
Heating plate power | 2.2 Kw | 2.2 Kw |
planner power: | 1.1 Kw | 1.1Kw |
Total power | 3.3 Kw | 3.3Kw |
G.W./N.W.: | 110/95 kgs | 90/70 kgs |
Packing size: | 90*67*54 cm | 76*55*58 cm |
Welding procedure for HDPE PIPE manual Butt Fusion Welding Machine
1. Check whether the specification and pressure grade of the pipe to be welded are correct, and check whether there are bumps, bumps and scratches on the surface. If the depth of the scar exceeds 10% of the wall thickness of the pipe, it should be partially removed before use;
2. Clean the oil or foreign matters at both ends of the pipe with a clean cloth;
3. Place the pipe to be welded in the frame slip, so that the length of both ends is equal (as short as possible without affecting the milling and heating). The part outside the frame of the pipe shall be supported by supports to reduce friction, and then be fastened with slips;
4. Put in the milling cutter, first turn on the power switch of the milling cutter, then close both ends of the pipe and apply appropriate pressure until there are continuous chips at both ends, remove the pressure, wait for a moment, then withdraw the movable frame, turn off the power supply of the milling cutter and take out the milling cutter. The chip thickness should be about
0.2-0.5mm. The chip thickness can be adjusted by adjusting the height of the milling insert;
5. Close the two pipe ends and check the alignment of both ends. The misalignment at both ends of the pipe should not exceed 10% of the wall thickness, which can be improved by adjusting the straightness and the elastic slip of the pipe; the gap between the two ends of the pipe should not exceed 10% of the wall thickness, otherwise it should be milled again until the above requirements are met;
6. Clean the dust and residue on the surface of the heating plate (pay special attention not to scratch the nonstick layer on the surface of the heating plate);
7. After the temperature of the heating plate reaches the set value, put it into the rack and apply the specified pressure until the minimum crimping on both sides reaches the specified value;
8. Reduce the pressure to the contact pressure and continue heating for the specified time;
9. When the time is up, withdraw the movable frame, quickly take out the heating plate, and then close the two pipe ends, with the time interval as short as possible;
10. Raise the pressure to the specified welding pressure, lock the fixing bolts on both sides of the frame, and keep the pressure for natural cooling. After cooling for the specified time, the fixing bolt is fully opened. Loosen the slip and take out the connected pipe.
Our service:
1. You can contact us directly.
2. We always provide high quality products and workable price for every clients and have won the trust, enjoy a good reputation in the market.
3. Machine Quality Guarantee: 12 months.--If any parts broken or does not work under normal operating, we provide them for free.
FAQ:
1. How to get a accurate quotation from us?
Provide us the detail of the material such as metal thickness and width.
2. What’s the shipping cost from China to your country?
We can send machine to your port or door address by sea or airplane. Please kindly tell us your nearest port or address with postcode.We have reliable shipping agent to insure the safe, convenient and timely delivery.
3. Payment terms, MOQ, warranty, FOB?
Payment terms: 30% TT paid in advance, the balance of 70% before the shipment.
Minimum order quantity: 1 set.
FOB :Shanghai.
Delivery time :7 days after receipt of formal order and 30% deposit.
Warranty:12 months.
4. What’s the package?
Fumigation-free plywood case or without package.
5. What about commissioning service?
We can offer commissioning service, the buyer need to afford plane tickets.
6. What’s policy for guarantee and broken parts?
Warranty period of equipment lasts a year, during which the broken parts and spares caused by quality can be offered free.
7.Any question, call us or send email, we will try our best to satisfy you.
Contact Person: Mrs. Vivian Chen
Tel: 86 13777804353