Product Details:
|
Product Name: | Professional 2 Clamps 3.3kW Pvc Pipe Heating Tools 250mm HDPE Butt Fusion Welding Machine | Pipe Size: | 90. 110. 125. 140. 160. 180. 200. 225. 250 |
---|---|---|---|
Total Power: | 3.3KW | Weight: | 56kg |
Dimension: | 76 X 55 X 58cm | Certificate: | ISO |
High Light: | 2 Clamps HDPE Butt Welder,250mm HDPE Butt Fusion Welding Machine,HDPE Butt Fusion Welding Machine 3.3kW |
Professional 2 Clamps 3.3kW Pvc Pipe Heating Tools 250mm HDPE Butt Fusion Welding Machine
1. The machine is used to weld pipes made from PE, PP, PVDF and cannot be used to weld material without description otherwise the machine may be damaged or some accident may be resulted in.
2. Don't use the machine in a place with potential hazard of explosion
3. The machine should be operated by responsible, qualified and trained personnel
4. The machine should be operated on a dry area. The protective measures should be adopted when it's used in rain or on wet ground.
5. The machine is operated by 220v±10%, 50Hz, if extended wire should be used, it should have enough lead section according to its length.
Feature
1. Milling cutter with limit switch can prevent the accidental activation.
2.The raw material of the machine frame is aluminum alloy, 45°slant design, is better to operate.
3. Lower start-up pressure make the small diameter pipe weld more reliable.
4. Welding position can transform that it is convenient for welding all kinds of pipe fittings.
5. Standalone dual channel timer can record both of heat and cooling hours, when timing is over, the timer will give an alarm.
6. High-precision shockproof pressure gauge with large dial is easy to read.
7. The lift of the machine can take the milling cutter and heating plate to the designated spot quickly.
Butt Fushion Welding Machine Technical data:
Model | SHT250-2M |
Welding range | 90. 110. 125. 140. 160. 180. 200. 225. 250 |
Total power | 3.3KW |
Supply Voltage | 220V 50Hz |
Heating plate Max temp. | 270 (℃) |
Ambient temperature | -10º~+40º |
G.W (kg) | 56 |
Packing size | 76 x 55 x 58cm |
Other name:
hdpe heat fusion welding machine, polyethylene fusion welding machine, pe pipe butt fusion, hdpe pipe jointing digital heater, polyethylene pipe butt welder, pipe fusion welding tool, poly pipe fusion welder
Common problems of various components of the hot melt machine when connecting PE pipes:
1. The maximum temperature of the heating plate of the heating plate reaches 250 °C, so be sure to pay attention to the following categories:
① Wear anti-cutting gloves ② Pay attention to the safety precautions of the actual operating staff. After the welding is completed, it should be placed in a special heating plate support frame. ③ The heating plate should be cooled before transportation to prevent fire.
④ After the electric welding is completed, put the heating plate in a safe area to prevent others from accidentally touching the burn. ⑤ Grasp the door handle when lifting the heating plate. Do not disconnect the switching power supply of the heating plate ⑧ Remember not to touch the heating plate with force
2. Milling cutter
① Before cutting the pipe (piece), make sure that the end face of the pipe (piece) is clean and free of dirt to prevent damage to the cutting blade ② Pipe (piece) cutting After the end, after the milling cutter disc stops rotating, take out the milling cutter disc and store it. ③ Hold the door handle when obtaining the milling cutter disc. ④ The milling cutter disc can only be rotated when it is installed on the welding frame. Do not arbitrarily adjust the toggle switch of the milling cutter
3. Hydraulic control cabinet
① Install the hydraulic components horizontally and firmly during operation, gradually charge the pipe to detect the drag force of the pipe, and lift the handles on both sides during transportation ② Remember not to place the hydraulic components perpendicular to the pipe. Place it to prevent oil leakage. ③ When making adjustments to this component, follow the relevant requirements of this manual, such as Instructions for Use
4. Frame
① Check the parts/materials to be welded to ensure that they are accurately clamped on the frame , to ensure the welding quality of electric welding. When heating, the actual operating staff should stand off the welding machine moderately. ② During electric welding, if the movable chuck and the fixed chuck collide, it is not necessary to use the main gate of the welding machine to shut down, only move the work The pressure adjustment lever can open the chuck. ③ When transporting the rack, make sure that the chucks are all tightened to prevent them from falling off.
Application
There are different size and operation for meeting different customer’s requirement.
1. Mentioned Series are based on the standard and regular hand-held socket welder with a new controller for overheat protection and easy operation.
2. Digital series add a digital controller and screen for improving the accuracy of the heating temperature. The temperature range can set as demand of different plastic pipes & fittings, required fusing temperature can fix and display on the screen, environment temperature will be adjusted and updated automatically, over-temperature will be alarmed automatically and etc. This provides a more excellent fusing result.
Service
HAITAO not only supplies reliable, durable and professional tools but we also aim to provide an excellent service to installers.
We offer a range of spare parts available for many products.If you require spare parts, pls let me know, tks.
Contact Person: Mrs. Vivian Chen
Tel: 86 13777804353